Everything by Adam Stein
Every piece credited to Adam Stein, newest first. Type a word to search within them.
Everything by Adam Stein, newest first
-
EnergyStatement
Nov 9, 2026 · Adam Stein
NRC Issues Construction Permit for X-energy's Advanced Reactor Project in Texas
-
EnergyAnalysis
Oct 2, 2026 · PJ Seel, Spencer Toohill, Adam Stein
Radiation Protection Needs a Stopping Point
Moving past ALARA requires a more substantial framework change than the NRC has proposed
-
EnergyAnalysis
Oct 2, 2026 · PJ Seel, Adam Stein
Closing the Gap on Greater-Than-Class-C Waste
A risk-informed disposal pathway is long overdue, but defense-in-depth needs a way to find that a barrier isn't doing any work
-
EnergyStatement
Sep 29, 2026 · Adam Stein
The NRC Approves Construction Permit for TVA’s Clinch River Small Modular Reactor
-
EnergyAnalysis
Sep 14, 2026 · Adam Stein
America Chose Its Nuclear Waste Site on a Guess About Cost, not Safety
The U.S. Shouldn’t Make the Same Mistake Twice
-
EnergyReport
Aug 17, 2026 · Adam Stein
Stakeholder Stratification
Risk Fragmentation and Distributed Decision Systems in Infrastructure Deployment
-
EnergyTool
Jul 1, 2026 · Yue "Joy" Jiang, Adam Stein
Mapping America's Nuclear Potential
Evaluating Deployment, Investment, and Impact in America's Clean Energy Future
-
EnergyAnalysis
Jul 1, 2026 · Adam Stein, Spencer Toohill
From Paper to Real-Life Reactors: The Holistic View of the Reactor Pilot Program
250 years later, the American nuclear experiment continues
-
EnergyRegulatory comment
Jun 16, 2026 · Adam Stein, Spencer Toohill, Deric Tilson and 2 others
Part 57 Should Be Built for High-Volume Licensing
A high-volume licensing pathway is faster when it is more focused, not less rigorous
-
EnergyTestimony
May 20, 2026 · Adam Stein
NRC Regulations Must Be Credible, Predictable, Timely, and Proportionate to Risk
Dr. Adam Stein's Testimony Before U.S. Senate Committee on Environment and Public Works
-
EnergyAnalysis
May 1, 2026 · Adam Stein
Part 57: Right-Sizing Nuclear Regulation for Low-Consequence Reactors
A first look at a potential new licensing pathway.
-
EnergyRegulatory comment
Apr 15, 2026 · Adam Stein, Spencer Toohill
Clarifying the Record on AB 2647: A Technical Response to Opposition Claims
Addressing misconceptions on regulatory policy, advanced reactor technology, and California’s energy options
-
EnergyLetter
Apr 15, 2026 · Adam Stein
Modernizing California’s Nuclear Policy: Support for AB 2647
A targeted, durable pathway to enable advanced nuclear energy for reliability, decarbonization, and economic growth
-
EnergyAnalysis
Apr 9, 2026 · Adam Stein, Spencer Toohill
Part 53: A Viable Licensing Pathway for New Reactors
What you need to know about the final Part 53 rule
-
EnergyAnalysis
Mar 9, 2026 · Adam Stein
Nuclear Waste Is a Wicked Problem
DOE Is Testing a Different Way Through It
-
EnergyStatement
Mar 4, 2026 · Adam Stein
The NRC Issues Construction Permit for Terrapower’s Natrium Reactor
-
EnergyAnalysis
Mar 2, 2026 · Deric Tilson, Adam Stein
Two New Papers Are Wrong About Cancer Risk from Nuclear Plants
Poor Research Design and Strong Claims Don’t Mesh Well
-
EnergyAnalysis
Feb 6, 2026 · Adam Stein
The NRC’s Problem Isn’t Caution. It’s Architecture.
What Will it Take for the NRC to Meet Its Statutory Obligations?
-
EnergyAnalysis
Jan 12, 2026 · Adam Stein
Why Billions for Uranium Enrichment Still Won’t Deliver Nuclear Fuel
Despite new federal spending, the missing ingredient for advanced nuclear power remains a buyer willing to commit early
1–20 of 102